The flow of a project:
Click on any snapshot in the gallery to bring up a larger image. Point to left or right of larger image and click to scan through slides.
-
Engineering drawings completed.
-
Surveying and site layout work.
-
Digging trenches for conduit.
-
Running conduit.
-
Positioning frame supports.
-
Installing the racking.
-
Installing the PV modules.
-
PV modules installed at one of the sites.
-
Running the wiring.
-
Preparing combiner box wiring.
-
One of the combiner boxes completed.
-
Pouring concrete for one of the inverter sheds.
-
Installing the inverters.
-
Installing the DC disconnects.
-
Wiring up one of the inverters.
-
Completing the AC disconnects.
-
Installing the data communications.
-
Final cleanup, including washing modules.
-
A view from one site to the other.
-
Viewing production data.